Swatch card No. SW-1369 · cut October 15, 2026

Apparel ManufacturingMill spec card

Modi to Open Arvind Mills' Rs 150 Crore Varanasi Plant on October 25

Prime Minister Modi will open Arvind Mills' Rs 150 crore Phase-1 plant on eight acres along NH-19 in Mirzamurad, Varanasi, on October 25, with expansion phases to follow.

Fiber
Apparel Manufacturing
Count
2 min read
Cut
Weight
394 words

Spec notes

  1. Prime Minister Narendra Modi will inaugurate the plant on October 25.
  2. Phase 1 represents an investment of approximately Rs 150 crore.
  3. The facility spans more than eight acres along National Highway 19.
  4. The site is located in Khochwan (Bhadhera) village, Mirzamurad, Varanasi, Uttar Pradesh.
  5. The project is designated Phase 1, indicating staged expansion.
PM Modi to Inaugurate Arvind Mills’ Varanasi Unit on October 25
Chip 01 · SW-1369PM Modi to Inaugurate Arvind Mills’ Varanasi Unit on October 25 — AI-generated

Prime Minister Narendra Modi will inaugurate Arvind Mills' new manufacturing unit in Mirzamurad, Varanasi, on October 25, giving the Ahmedabad-headquartered textile group a formal government stamp on a facility that represents Phase 1 of a larger build-out.

The confirmed figure is approximately Rs 150 crore — roughly $18 million at current exchange rates — invested in the first phase. The plant covers more than eight acres along National Highway 19, positioning it on one of north India's principal freight corridors.

What do we know about the site?

The facility sits in Khochwan (Bhadhera) village, near the Rupapur intersection in Mirzamurad, in Varanasi district, Uttar Pradesh. Key confirmed details:

  • Investment: approximately Rs 150 crore for Phase 1
  • Site: more than eight acres
  • Location: NH-19, Khochwan (Bhadhera) village, Mirzamurad, Varanasi
  • Inauguration date: October 25, by Prime Minister Modi

The designation of the project as Phase 1 signals that Arvind has structured the Varanasi investment for staged expansion. The company has not yet disclosed Phase 2 spending, capacity or product lines in the material released to date.

Why does the location matter for sourcing?

The choice of eastern Uttar Pradesh places the plant outside India's established western textile cluster, where Arvind's core denim and woven operations are concentrated. An NH-19 address offers road connectivity toward Delhi in the west and Kolkata and Haldia port in the east — a logistics consideration for domestic distribution and, potentially, export shipments.

For sourcing teams, the opening raises the near-term questions that any new greenfield site invites: which product categories the unit will run, at what volume, and on what timeline the capacity ramps beyond Phase 1. Those parameters have not been specified in the announcement.

A prime-ministerial inauguration also carries weight beyond ceremony. It aligns the project with the government's manufacturing-push agenda and can translate into faster administrative clearances and access to state incentive schemes for apparel and textile investment in Uttar Pradesh — factors that shape the effective cost base of production at the site.

What comes next?

Watch for the disclosures that typically follow such an opening — employment figures, machinery configuration, certification status and committed order books — which will determine whether Varanasi becomes a meaningful node in Arvind's production network or a prestige signal.

The October 25 inauguration should bring at least some of those operating details into the open.

via Apparel Resources (Source)

Filed under

Share this article:

More from Elena Vasquez

Elena Vasquez

Show full bio

News editor covering money, funding and market shifts around fashion industry as a trade and business at The Fabric Brief.

223 articles

Also on the board

« Previous article